鑄鐵平臺的使用和安裝步驟介紹
時(shí)間:2016/1/5 15:38:22
瀏覽量:454
1.使用之前,先進(jìn)行安裝調試,以防損壞鑄鐵平臺的工作面;
2.使用過(guò)程中要注意防潮、防腐蝕,同時(shí)注意不要將鑄鐵平臺放于過(guò)高和過(guò)低的溫度環(huán)境下存放;使用環(huán)境:
使用地點(diǎn)
|
|
海拔高度
|
<1000M
|
最高溫度
|
+40℃
|
最低溫度
|
-5℃
|
最大日溫差
|
15K
|
相對溫度(在20℃時(shí))
|
95%
|
安裝地點(diǎn)
|
室內
|
運行方式
|
連續運行
|
3.工件的重量不要超過(guò)鑄鐵平臺的額定載荷,以免造成工作質(zhì)量降低以及損壞鑄鐵平臺的結構使之變形。
4.在鑄鐵平臺使用完畢后,應將其清洗干凈,同時(shí)作好防銹工作。
一般鑄鐵平臺的使用壽命很長(cháng),只要采用正確的方法使用和存放,鑄鐵平臺工作面的精度可以保持使用2年以上,當精度降低時(shí)可以通過(guò)調試或刮研工藝恢復。
鑄鐵平臺的安裝步驟介紹
1、墊鐵安裝:鑄鐵平臺調至水平、負荷均勻分布于各支點(diǎn)上。環(huán)境溫度(20±5)℃。使用時(shí)應避免振動(dòng)。鑄鐵平臺采用墊鐵安裝的優(yōu)點(diǎn),安裝快捷、移動(dòng)方便。
2、支架安裝:鑄鐵平臺輕放到支架上、調整支架上的微調螺栓至到鑄鐵平臺水平。支架可減輕檢驗人員的勞動(dòng)強度。支架高度一般在500-600mm左右。
3、地錨器安裝:鑄鐵平臺可以設計地錨器安裝,首先用戶(hù)根據鑄鐵平臺的圖紙做好地基和預埋孔,然后把地錨器放到提前設置的預留孔里,將鑄鐵平臺調整水平,
4、地腳螺栓安裝:鑄鐵平臺根據用戶(hù)的要求設計安裝方式,地腳螺栓安裝。
Introduction to the use and installation steps of cast iron platforms
1. Before use, first install and debug to
prevent damage to the working surface of the cast iron platform;
2. Pay attention to moisture and corrosion
during use, and be careful not to store the cast iron platform in too high or
too low temperature environment; use environment:
使用地點(diǎn)Operation
mode
|
|
海拔高度Altitude
|
<1000M
|
最高溫度Maximum
temperature
|
+40℃
|
最低溫度lowest
temperature
|
-5℃
|
最大日溫差Maximum daily temperature difference
|
15K
|
相對溫度(在20℃時(shí))Relative temperature (at 20 ° C)
|
95%
|
安裝地點(diǎn)Installation
Location
|
室內indoor
|
運行方式place
of use
|
連續運行continue
to operate
|
3. The weight of the workpiece should not
exceed the rated load of the cast iron platform, so as to avoid the work
quality degradation and damage to the structure of the cast iron platform.
4. After the cast iron platform is used, it
should be cleaned and rust-proof work.
Generally, the service life of the cast
iron platform is very long. As long as the correct method is used and stored,
the precision of the working surface of the cast iron platform can be
maintained for more than 2 years. When the accuracy is lowered, it can be
recovered by debugging or scraping process.
Introduction to the installation steps of the cast iron platform
1. Bracket installation: The cast iron
platform is lightly placed on the bracket, and the fine-tuning bolts on the
bracket are adjusted to the level of the cast iron platform. The bracket can
reduce the labor intensity of inspectors. The height of the stent is generally
about 500-600 mm.
2. Ground Anchor Installation: Cast iron
platform can be designed to install ground anchor. First, according to the
drawings of cast iron platform, users can make foundation and pre-embedded
holes, then put the ground anchor in the pre-set reserved holes, and adjust the
level of cast iron platform.
3. Installation of cushion iron: Cast iron
platform is adjusted to level and load is evenly distributed on each fulcrum.
The ambient temperature is (20 +5)degrees Celsius. Vibration should be avoided
in use. Cast iron platform has the advantages of cushion iron installation,
fast installation and convenient movement.
4. Installation of anchor bolts: Cast iron
platform is designed and installed according to user's requirements, and anchor
bolts are installed.
Company name: botou zhuoyuan mechanical equipment manufacturing co.,LTD
Registered
address: jiaohe development zone, botou city, hebei province
Fax
number: 0317-8031093
Contact
information: 15369812793 (WeChat with the same number) liansheng chu
Postcode:
062151
Enterprise
email:
1358827475@qq.com
Account
Opening Bank: Botou Branch of Bank of China
Account
number: 100399943203
Agricultural
bank account number: 6228481739059615270http://zhuoyuanjixie.com